Tuesday, January 08, 2008

The Best Laid Plans…

The survey of Rowland Spring cave continues. A plan intended to yield the maximum data derived; and it may have been a good plan if everything remained constant. Constant, things were not. Despite the ever-changing environment, the trip was a success; fun and safe caving, additional survey data, and a renewed understand of the cave system.

To set the stage: It had rained in the Marion area two weeks prior, it also happened to have been bitterly cold only days before, and there was even snow on the ground. We know there is an active stream in the cave, but it has been dry for some time; and we know the cave had a tendency to be cold due to the significant flow of air between the two entrances.

Walking to the cave Saturday morning, there was evidence of the recent rain. The streambed outside the cave was decorated with an array of fresh leaf dams formed from heavy rains. The good news however was the stream was dry; if there was any connection between the outside stream and inside stream, the dry streambed was an encouraging sign.

Inside the cave the interior stream could immediately be heard, not that surprising given the stream in only 50ft from the entrance. Climbing down to stream level resulted in two observations; the stream was higher than ever seen before, but still below boot level. And the lower level of the cave was downright cold; in fact, the mud on the floor was frozen in a honeycomb of ice crystals a few inches high.

The pit was rigged and Ken descended first; his goal was to check out the stream level at the bottom of the pit. His initial report was satisfactory to continue into the cave. However, two leads in the stream passage were immediately scratched from the agenda.

As the remaining team dropped the pit, Ken’s continuing report became a bit less appealing. "The water could not be avoided, and the water was up to his knees." Knowing the remaining leads were out of the stream, we continued. Side note: the height difference between Ken and Lisa is such that water level for Lisa was well above her knees.

Out of the water and the settled cold air, the team initially set out to tackle the first lead. The lead presented an interesting climb; Mike managed to climb up with encouragement from Lisa and an excellent belay from Ken. Fortunately the lead looped back to one of the three leads we skipped in the stream; from this vantage point the second lead in the stream could be better viewed, the lead did nothing. Three leads knocked out!

The next lead was another promising pit, dropping mud into the pit resulted in a plunk rather than a splat…water. Ken found the deepest section in the big room to have water; at least 5ft of water. The pit would be done another day.

The next lead was a climb up a chimney; Mike continued to demonstrate his solid climbing skills. I on the other hand, opted to climb the rope. The lead ended in a solid rock hole that even Lisa would not be able to get through, disappointing as what little could be seen there appeared to be at least an additional room. Another lead completed.

As Mike and I wrapped up the lead Ken and Lisa investigated a different lead; their lead was a small vertical crack. Their effort, confirmed by a visual connection, brought the lead into a previously surveyed room. Once more lead down.

Mike and I investigated a lead near the graffiti in the big room; the lead has excellent potential and leads into some new passage. It was determined a team of three would be preferred, otherwise the survey effort would be hampered by one individual doing instruments, book, and sketching.

Instead, we found Ken and Lisa in time to check out a high lead. Sending Lisa,we were able to get a visual connection; in the process, Ken found a section of the cave I had previously hand drawn, he thought best to survey. In one section, a stream could be heard beyond a narrow, soda straw infested restriction. Yet one more strong candidate for continued cave, that came to an end.

Knowing what lay in front of us we opted to exit the cave. The exit went smoothly despite the bone chilling water. Before long we were all out of the cave enjoying warmer temperatures, a good Italian meal, and Mike’s home brew.

The good news, the cave continues to grow. While we knocked off quite a few leads, there are four remaining. The pit, a climb, a low muddy crawl, and the continued passage confirmed this trip. I am looking forward to seeing what other secrets this cave may reveal.

240ft surveyed, cave length now at 2840ft.

It should be mentioned that on a previous trip an unusual concentration of dead bats in a very localized part of the cave was found; Ken contacted a biologist whom recently published an article regarding an unknown bacteria that seems to be effecting bats to see if there could be any connection. The biologist was provided pictures and reported to Ken what to look for. We did not find any live bats showing any signs of the bacteria, nor did we find anymore dead bats.

Sunday’s caving put us back at Hancock; Ken had one more unconfirmed report of cave that needed to be investigated. After talking to the landowner regarding the status of his new house and a few other things, we looked around the rock ledge for something that fit the description. Ken found a passage, and it fit the description he had.

As we started the survey, the rain also started; fortunately we were soon protected from the rain once inside the cave. However we were not protected by the cold; this cave still had ice from the recent cold snap.

The cave had a large daddy long leg population; I was very surprised to find the “spiders” actually moving. I have no knowledge of spiders, but I would have thought they would be frozen solid like the surrounding water.

The survey didn’t take long, I don’t have the actual survey data, but I would estimate the cave is under 50ft in length.

No comments: